$50 = Border-Free Shipping • SHOP NOW
Kobe 72 Inch Flip Top Mobile Training Table with Cherry Finish & 2 'M' Stack Chairs in Grey - Portable Folding Table for Office, Classroom, Conference Room, and Home Use
Kobe 72 Inch Flip Top Mobile Training Table with Cherry Finish & 2 'M' Stack Chairs in Grey - Portable Folding Table for Office, Classroom, Conference Room, and Home UseKobe 72 Inch Flip Top Mobile Training Table with Cherry Finish & 2 'M' Stack Chairs in Grey - Portable Folding Table for Office, Classroom, Conference Room, and Home UseKobe 72 Inch Flip Top Mobile Training Table with Cherry Finish & 2 'M' Stack Chairs in Grey - Portable Folding Table for Office, Classroom, Conference Room, and Home UseKobe 72 Inch Flip Top Mobile Training Table with Cherry Finish & 2 'M' Stack Chairs in Grey - Portable Folding Table for Office, Classroom, Conference Room, and Home UseKobe 72 Inch Flip Top Mobile Training Table with Cherry Finish & 2 'M' Stack Chairs in Grey - Portable Folding Table for Office, Classroom, Conference Room, and Home UseKobe 72 Inch Flip Top Mobile Training Table with Cherry Finish & 2 'M' Stack Chairs in Grey - Portable Folding Table for Office, Classroom, Conference Room, and Home UseKobe 72 Inch Flip Top Mobile Training Table with Cherry Finish & 2 'M' Stack Chairs in Grey - Portable Folding Table for Office, Classroom, Conference Room, and Home UseKobe 72 Inch Flip Top Mobile Training Table with Cherry Finish & 2 'M' Stack Chairs in Grey - Portable Folding Table for Office, Classroom, Conference Room, and Home Use

Kobe 72 Inch Flip Top Mobile Training Table with Cherry Finish & 2 'M' Stack Chairs in Grey - Portable Folding Table for Office, Classroom, Conference Room, and Home Use

$199.61 $362.94 -45%
Color:Mahogany
Mahogany
Grey
Maple
Cherry

Delivery & Return:Free shipping on all orders over $50

Estimated Delivery:7-15 days international

People:26 people viewing this product right now!

Easy Returns:Enjoy hassle-free returns within 30 days!

Payment:Secure checkout

SKU:72365835

Guranteed safe checkout
amex
paypal
discover
mastercard
visa

Product Description

Kobe Table Rounded Corners make it safe for educational purposes. Locking casters which makes the table mobile. Kobe Table Flip-Top Training Table and 2 "M" Stacking Chairs The elegant Kobe collection puts the class in classroom. These versatile tables are at home in classrooms, lunch rooms as well as stylish restaurant settings. This set includes one 48-inch long training table and two Burgundy "M" Stack Chairs. Kobe Table and "M" Chair Features Feature Versatile table and chair set includes a Kobe table and two "M" Stacking Chairs. Scratch Resistant Laminate tabletop is scratch, stain and scald resistant, wipes clean easily and is constructed of a 1-inch thick thermal fused melamine laminate finished with a black edge banding. Portability "M" stack chairs have a black metal frame and contoured plastic seat and back with built-in carrying handle. Storage Sturdy and lightweight chairs can be easily stored away in stacks of 12. Regency Kobe Nesting Table and M Stacking Chairs The Kobe table is constructed of a thermal fused melamine laminate tabletop that is 1-inch thick and finished with a black edge band. The tabletops are double-sided and finished on the other side. Simply pick the side you like and install the base on the other. Self tapping wood screws and a placement template are included. The base is constructed of black tubular steel. Available in colors Mahogany, Cherry, Maple, Grey, Ash Grey and White. The sturdy, lightweight "M" stack chair by Regency offers durability, style and value. Its black metal frame and contoured plastic seat and back are strong and easy to clean. This versatile stack chair easily stores away in stacks of 12 and features a built in handle for easy mobility. Regency Kobe Nesting Table and M Stacking Chairs The Kobe table is constructed of a thermal fused melamine laminate tabletop that is 1-inch thick and finished with a black edge band. The tabletops are double-sided and finished on the other side. Simply pick the side you like and install the base on the other. Self tapping wood screws and a placement template are included. The base is constructed of black tubular steel. Available in colors Mahogany, Cherry, Maple, Grey, Ash Grey and White. The sturdy, lightweight "M" stack chair by Regency offers durability, style and value. Its black metal frame and contoured plastic seat and back are strong and easy to clean. This versatile stack chair easily stores away in stacks of 12 and features a built in handle for easy mobility. Color Mahogany Reverse Side Grey Color Cherry Reverse Side Maple Color Maple Reverse Side Cherry Color Ash Grey Reverse Side White Mahogany Cherry Maple Ash Grey Table Sizes Available W” X D” X H” Weight 48” x 24” x 29” 58 48” x 30” x 29” 65 60” x 24” x 29” 66 60” x 30” x 29” 76 72” x 24” x 29” 83 72” x 30” x 29” 100 84” x 24” x 29” 105

Product Features

Unique nesting 72-inch Flip Top Table- Unlock the quick-release lever and flip down the entire tabletop to nest together when not in use

Tabletop is constructed of a 1-inch thick thermal fused melamine laminate finished with a black t-moulding edge banding

Cherry laminate tabletop is scratch, stain and scald resistant, wipes clean easily and is backed by a 10-Year Limited Manufacturer's Warranty

"M" stack chairs have a black metal frame and contoured plastic seat and back with built-in carrying handle

Sturdy and lightweight chairs can be easily stored away in stacks of 12

We use cookies to enhance your browsing experience, serve personalized ads or content, and analyze our traffic. By clicking "Allow cookies", you consent to our use of cookies. More Information see our Privacy Policy.
Top